spr,spr americas,sekisui spr,sekisui,sekisui,sekisui pvc,spr pvc,spr,pipeline renewal,spr pipeline rehabilitation,pipeline,pipeline renewal,pipe renewal,pipeline rehabilitation,pipe rehabilitation,sewer,sewer pipe,stormwater pipe,culvert,culvert renewal,stormwater,pvc,pvc liner,grout,grouted in place,large diameter,high strength grout,non-circular,non circular,sewer pipe renewal,sewer pipe rehabilitation,cipp,manhole,trenchless,trenchless technology,trenchless pipeline renewal,trenchless pipeline rehabilitation,flow,live flow,bends,curves

Project References

JOA_103
BuiltWithNOF

SPR Project References

City of Los Angeles, Hyperion Treatment Plant: 260’ of 5’x 13’ Box Culvert

Keith Hanks, Sr. Sanitary Engineer
Waste Water Conveyance Engineering Div.
1149 S. Broadway, Suite 630
Los Angeles, CA 90015
(213) 485-1694
install5

Los Angeles County, Joint Outfall “A” Project, Phase 1 & 2: 5,000’ of 114” Semi-elliptical pipe, 518’ of 78” Semi-elliptical pipe

Anthony Howard
County Sanitation Districts of Los Angeles County
Sewer Design Section
P.O. Box 4998
Whittier, CA  90607
(562) 699-7411, ext. 1603
JOA_1

Northeast Ohio Regional Sewer District, Westerly Low Level Interceptor: 1,300’ of 48” liner installed inside a 60” pipe.

David Mast, P.E.
Office Lead, Senior Project Manager
NTH Consultants, Ltd
820 West Superior Avenue, Suite 200
Cleveland, OH  44113
(216) 344-4040
Cleveland S Turn_web

©2006, Sekisui SPR Americas, LLC. Please contact webmaster@sekisui-spr.com for any comments or problems with this site.